Location | Northumberland |
---|
Quay Length (m) | 160m |
---|
Site Size (ha) | 36 HA including 11.13 HA Enterprise Zone |
---|
Development Land Size (ha) | 24 HA including 11.13 HA Enterprise Zone |
---|
LOA (m) | 220m |
---|
Beam (m) | 55m |
---|
Current Draft (LAT) (m) | 10m |
---|
General load capacity (t/m2) | 10T/m2 |
---|
Heavy lift capacity (tonnes) | 400 tonnes |
---|
Description |
---|
Energy Central is a unique partnership between Advance Northumberland, Northumberland County Council, ORE Catapult and the Port of Blyth, encompassing a selection of strategic land development sites across the Blyth Estuary. Northumberland Energy Park Phase 1 is an established fully operation hub made up of world-leading organisations, skills and infrastructure making it one of Europe’s outstanding investment destinations for those operating in the energy, offshore wind and subsea sectors. A premier East Coast UK location for a range of energy – based industries, including the global offshore and marine sectors:
|
Details |
---|
Owners: Advance Northumberland Website: http://www.energycentraluk.co.uk/ Telephone: 01670 528463
|