Location | North Tyneside |
---|
Quay Length (m) | 268 quay frontage
Aim to maintain 10m below chart datum |
---|
Site Size (ha) | 13 ha |
---|
LOA (m) | 220m |
---|
Beam (m) | Over 40m |
---|
Current Draft (LAT) (m) | Up to 10m below chart datum |
---|
General load capacity (t/m2) | New Heavy Load Quay 35T/m2 with crane peak track pressure at 61.4T/m2 |
---|
Description |
---|
Swans Energy Park is home to 268m of deep-water quay with heavy load out facilities, adjacent wet berth, and support areas. The former shipyard includes the entire 31.96-acre site located on the North Bank of the River Tyne, with access roads, two quays, two river berths, a wet berth facility and is a major artery to the North Bank of the Tyne. This site is available for co-location of projects and development of facilities and manufacturing capability. Site characteristics:
Site location:
Swans Energy Park combines capacity and capability with the Neptune and Offshore Technology Parks. The sites are owned and managed by Shepherd Offshore and occupied by companies such as JDR, Bridon-Bekaert, IHC, and Baker Hughes. Engaging all current users to develop connectivity and increase volume, the facility produces a win/win for the area and supply chain. Offshore energy, subsea and marine businesses such as SMD, GE, WD Close, Subsea 7, A2Sea, ALE, Technip FMC and others have recently used the on-site quay and deep-water berths for load outs, mobilisation, and berthing. |
Details |
---|
Owners: Shepherd Offshore Limited Contact: Shepherd Offshore Limited Email: headoffice@shepherdoffshore.com Website: https://shepherdoffshore.com/facilities-properties/swans-energy-park/ Telephone: +44 (0)191 262 9614 |